Innovative Water Management Systems Integrated At New Testa Produce Distribution Center

CHICAGO (June 22, 2011)—Wind power is an obvious sustainability feature at Testa Produce, Inc.’s new distribution center, thanks to its 238-foot freestanding wind turbine, but innovative approaches to water management are critical to the building’s energy- and resource-efficient operation, as well. Through a multifaceted system, with both internal and external features, Testa Produce expects to achieve a 40 percent reduction in total demand for water used in the 91,000-square-foot facility each year.

The company’s water management system begins with exterior landscaping, which is planted both on the grounds and on the building’s partially vegetated roof with native and drought-resistant species that require minimal irrigation. The 45,000-square-foot vegetated roof itself increases water conservation by preventing rainwater runoff. Further, Testa’s parking lot and walkways are bordered with permeable pavers. Rainwater drains through the pavers into a 140,000-gallon bio swale system, which encourages infiltration into existing soils and filters excess water into a 765,000-gallon retention pond, reducing demand on public sewers. A 5,000-gallon internally filtered rainwater harvesting cistern stores water for non-potable uses throughout the building, including providing all water needed to flush toilets during a typical year.

The new Testa Produce distribution center, which celebrated its grand opening in early May, is expected to be the first food distribution facility in the nation to gain the U.S. Green Building Council’s highest available LEED® rating --- Platinum Certification.

“We set out to build the most sustainable, environmentally friendly distribution center in the country and efficient water management is a fundamental part of the plan,” says Peter Testa, President of Testa Produce. “We’ve put some of the most innovative systems available into play and they’re combining to dramatically reduce our consumption. It’s something all of our associates are really proud of.”

The water management system is just one of many advanced sustainability features, including the wind turbine, vegetated roof, and extensive use of solar panels at the new Testa Produce distribution center.  The facility was designed by Epsteinarchitects. Summit Design + Buildserved as the construction manager and WBS Equitiesserved as owner’s project consultant. Construction and permanent financing was provided by MB Bank. All are local Chicago-based concerns.

Members help make our journalism possible. Become a Restaurant Business member today and unlock exclusive benefits, including unlimited access to all of our content. Sign up here.

Multimedia

Exclusive Content

Financing

Despite their complaints, customers keep flocking to Chipotle

The Bottom Line: The chain continued to be a juggernaut last quarter, with strong sales and traffic growth, despite frequent social media complaints about shrinkflation or other challenges.

Operations

Hitting resistance elsewhere, ghost kitchens and virtual concepts find a happy home in family dining

Reality Check: Old-guard chains are finding the alternative operations to be persistently effective side hustles.

Financing

The Tijuana Flats bankruptcy highlights the dangers of menu miscues

The Bottom Line: The fast-casual chain’s problems following new menu debuts in 2021 and 2022 show that adding new items isn’t always the right idea.

Trending

More from our partners